Final | 3/6/2002 | 3/7/2002 | 3/7/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 12:08:39. Contact: ###-####.
|
Final | 3/5/2002 | 3/6/2002 | 3/6/2002 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 13:25:41. Contact: ###-####. gfci in bathroom 3/6/2002 10:08:41 AM
|
ELE-Aging Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | | NR |
Joe Ray
|
|
|
suc 1/8/2002 8:09:08 AM
|
Electrical Rough-In | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 07:39:54. Contact: ###-####. p/s ug n ok 10/9/2001 12:08:41 PM
|
Rough-In Permanent Service | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | FAIL |
Joe Ray
|
|
|
###-#### boxes in plenum 10/8/2001 1:18:49 PM
|