Final | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 07:54:06. Contact: ###-####.
|
ELE-Aging Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | | NR |
Joe Ray
|
|
|
suc 1/8/2002 8:09:00 AM
|
Electrical Rough-In | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 07:42:21. Contact: ###-####. p/s ug n ok 10/9/2001 12:08:24 PM
|
Rough-In Permanent Service | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | FAIL |
Joe Ray
|
|
|
###-#### boxes in plenum 10/8/2001 1:18:23 PM
|