Final | 11/7/2001 | 11/8/2001 | 11/8/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 12:29:19. Contact: ###-####.
|
Final | 11/6/2001 | 11/6/2001 | 11/6/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by Inspector: 336 On 11/6/2001 10:44:19 AM
|
Final | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | CANC |
Pat Lass
|
|
|
DOUG ###-#### called in late 11/5/2001 2:52:39 PM
|
Electrical Rough-In | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PASS |
Pat Lass
|
|
|
###-#### DOUG
|
Rough-In Permanent Service | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Pat Lass
|
|
|
###-#### doug walls ok 10/19/2001 2:34:46 PM
|
Electrical Rough-In | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | PART |
Pat Lass
|
|
|
###-#### wall recover
|
Electrical Rough-In | 10/12/2001 | 10/15/2001 | 10/15/2001 | A | CANC |
Pat Lass
|
|
|
###-#### Not ready 10/15/2001 9:20:34 AM
|
Electrical Rough-In | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PART |
Pat Lass
|
|
|
U/G & Back wall ok 10/15/2001 2:24:30 PM
|