Final | 12/13/2001 | 12/13/2001 | 12/13/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 07:16:20. Contact: ###-####.
|
Final | 12/12/2001 | 12/12/2001 | 12/12/2001 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 10:14:31. Contact: ###-####. called contractor needs to check his work no power gfci etc. 12/12/2001 4:11:41 PM \ 12/12/2001 4:11:45 PM
|
Final | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 10:55:47. Contact: ###-####.
|
Permanent Service | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 16:20:22. Contact: ###-####. p/s o/h new ok this was a u/g that was changed to o/h 12/4/2001 10:40:39 AM
|
Permanent Service | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 10:38:45. Contact: ###-####. called guy kit shall oppose the strain of the service drop 12/3/2001 2:09:33 PM
|
Rough-In Permanent Service | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/18/2001 at 11:56:54. Contact: ###-####. r/i p/s u/g new ok 10/18/2001 3:17:22 PM
|
Rough-In Permanent Service | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | NR |
Jack Frank
|
|
|
###-#### building permit states finished basement shall wire basement called 10/18/2001 9:42:08 AM
|