ELE-Aging Inspection | 12/23/2002 | 12/23/2002 | 12/23/2002 | | PASS |
Tim McCullough
|
|
|
doc.final 12/23/2002 1:32:21 PM
|
Electrical Rough-In | 3/15/2002 | 3/19/2002 | 3/19/2002 | A | PASS |
Marv Burrus
|
|
|
###-####. chiller branch circuits for relay control panel. 3/19/2002 9:19:45 AM
|
Electrical Rough-In | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PART |
Marv Burrus
|
|
|
###-####. penthouse chiller service disconnect switch-gear, r/i. 1/11/2002 3:04:50 PM
|
ELE-Aging Inspection | 12/25/2001 | 12/25/2001 | 12/25/2001 | | PASS |
Marv Burrus
|
|
|
no inspection requests. 12/26/2001 7:49:42 AM
|
Electrical Rough-In | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 12:27:03. Contact: ###-####. conference; concerning future roof top refrigeration units; 10/25/2001 11:25:40 AM
|