Final | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 11/09/2001 at 08:43:13. Contact: ###-####.
|
Electrical Rough-In | 10/25/2001 | 10/25/2001 | 10/25/2001 | A | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 10/25/2001 11:23:54 AM r/i ok
|
Final | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 15:31:31. Contact: ###-####. n o final r/i only 10/25/2001 11:23:29 AM
|
Electrical Rough-In | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | PART |
Jack Frank
|
|
|
conf only new master bath and bedroom ok 10/24/2001 4:16:49 PM
|
Electrical Rough-In | 10/24/2001 | 10/24/2001 | 10/24/2001 | A | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 10/24/2001 4:16:05 PM conference ok
|