Final | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 09:49:46. Contact: ###-####.
|
Final | 12/7/2001 | 12/10/2001 | 12/10/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/07/2001 at 13:19:16. Contact: ###-####. label panel 12/10/2001 10:07:04 AM
|
Electrical Rough-In | 10/25/2001 | 10/30/2001 | 10/30/2001 | A | PASS |
Joe Ray
|
|
|
STEVE ###-#### p/s ug n ok 10/30/2001 10:58:16 AM
|