Final | 2/6/2002 | 2/6/2002 | 2/6/2002 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 07:21:10. Contact: ###-####. ok final 2/6/2002 9:38:48 AM
|
Electrical Rough-In | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 08:28:47. Contact: ###-####. ok ri 1/22/2002 10:05:02 AM
|
Electrical Rough-In | 12/26/2001 | 12/26/2001 | 12/26/2001 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 10:05:54. Contact: ###-####. cor. posted talked with contractor at job site 300-4 protection for M C cable 12/26/2001 4:35:12 PM
|