Final | 12/10/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 13:43:08. Contact: ###-####.
|
Electrical Rough-In | 11/6/2001 | 11/9/2001 | 11/9/2001 | A | PASS |
Joe Ray
|
|
|
###-#### STEVE p/s ug n ok 11/9/2001 12:38:20 PM
|