Final | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 10:28:43. Contact: ###-####.
|
Final | 1/24/2002 | 1/24/2002 | 1/24/2002 | P | PART |
Joe Ray
|
|
|
###-#### temp/occup 1/24/2002 3:19:30 PM secure boxes under cabinets/gfci for fountain 1/24/2002 3:20:40 PM
|
ELE-Aging Inspection | 1/14/2002 | 1/14/2002 | 1/14/2002 | | NR |
Joe Ray
|
|
|
suc 1/14/2002 3:39:56 PM
|
Electrical Rough-In | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PASS |
Joe Ray
|
|
|
###-#### STEVE
|
Electrical Rough-In | 11/8/2001 | 11/9/2001 | 11/9/2001 | P | FAIL |
Joe Ray
|
|
|
STEVE ###-#### 300-4 shall protect mc cable with in 1 1/4 11/9/2001 1:43:13 PM
|