Final | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 15:17:42. Contact: ###-####. ok 12/20/2001 10:30:46 AM
|
Permanent Service | 12/20/2001 | 12/20/2001 | 12/20/2001 | A | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 12/20/2001 10:31:13 AM p/s o/h rec.ok
|
Electrical Rough-In | 12/17/2001 | 12/18/2001 | 12/18/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/17/2001 at 13:51:09. Contact: ###-####. CONFERENCE ok 12/17/2001 5:06:31 PM
|
Final | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 16:27:36. Contact: ###-####. cor. posted called see carrection posted at panel in basement or JF for details 12/17/2001 10:24:51 AM
|
Permanent Service | 12/17/2001 | 12/17/2001 | 12/17/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by Inspector: 315 On 12/17/2001 5:25:13 PM no p/s conference only 12/18/2001 12:30:30 PM
|
Electrical Rough-In | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/13/2001 at 10:09:59. Contact: ###-####.--for conf insp--call 1st before insp ###-####- jim or wayne conference house turned into doctors office 11/14/2001 12:12:16 PM
|