Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 13:34:42. Contact: ###-####. ok final 11/16/2001 11:09:00 AM
|
Electrical Rough-In | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 11/15/2001 2:43:17 PM met with Mike K and Mitchell electric , conference ok
|
Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | NR |
Mike Kinnear
|
|
|
MARVE ###-#### need to have dan meet me out on job site 11/15/2001 9:54:08 AM
|
Final | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | PART |
Mike Kinnear
|
|
|
###-#### CALL 25 MINUTES BEFORE GETTING JOB conf with contractor 11/15/2001 1:24:09 PM
|