DOC - Permit Finaled | | | 10/18/2002 | | DONE |
|
|
|
|
Final | 12/4/2001 | 12/7/2001 | 12/7/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### cor. posted met with contractor see JF for details tild contractor he could call me when corrections are made so owner will not be without power over the weekend 12/7/2001 5:04:52 PM
|
Permanent Service | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 12/7/2001 7:06:45 PM p/s o/h rec. ok contractor will call for final next week
|
Permanent Service | 11/14/2001 | 11/20/2001 | 11/20/2001 | P | NR |
Jack Frank
|
|
|
kevin- ###-#### per ser called left message 11/20/2001 4:33:06 PM
|