Final | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 13:35:16. Contact: ###-####. ok final 5/9/2002 10:04:39 AM
|
Final | 1/18/2002 | 1/22/2002 | 1/22/2002 | A | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 14:32:27. Contact: ###-####. ok cover underground conduit - ok final on hot tub 1/22/2002 8:50:55 AM
|
Electrical Rough-In | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | NR |
Mike Kinnear
|
|
|
kevin ###-#### conf regarding bonding for hot tub & underground conduit needs to inspected for cover 1/17/2002 1:16:46 PM
|
Electrical Rough-In | 11/27/2001 | 11/28/2001 | 11/28/2001 | A | PASS |
Mike Kinnear
|
|
|
pool bonding\\###-#### ok cover pool bonding 11/28/2001 9:39:05 AM
|