Final | 2/12/2002 | 2/13/2002 | 2/13/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 18:23:53. Contact: ###-####. ok 2/13/2002 10:57:34 AM
|
Rough-In Permanent Service | 12/11/2001 | 12/12/2001 | 12/12/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 16:55:54. Contact: ###-####. p/s ug n ok 12/12/2001 4:30:24 PM
|
Rough-In Permanent Service | 12/11/2001 | 12/12/2001 | 12/11/2001 | A | CANC |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 12:31:43. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/11/2001 at 16:54:47.
|
Rough-In Permanent Service | 12/6/2001 | 12/10/2001 | 12/10/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/06/2001 at 08:24:42. Contact: ###-####. wire in plenum/protect wire with in 6 ft of attic access 12/10/2001 10:06:42 AM
|
Rough-In Permanent Service | 11/27/2001 | 11/30/2001 | 11/28/2001 | A | CANC |
Joe Ray
|
|
|
steve ###-####---cancel per steve
|