Final | 7/24/2002 | 7/25/2002 | 7/25/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/24/2002 at 22:48:45. Contact: ###-####.
|
Electrical Rough-In | 3/28/2002 | 3/29/2002 | 3/29/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 17:06:53. Contact: ###-####. kitchen, mstr. bathrm. r/i. 3/29/2002 10:09:19 AM
|
Electrical Rough-In | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 16:55:07. Contact: ###-####. conference; kitchen, barhrm remodel. 3/1/2002 10:19:38 AM
|