Final | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PASS |
Marv Burrus
|
|
|
###-#### KELLY
|
Final | 2/25/2002 | 2/26/2002 | 2/26/2002 | A | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 07:57:14. Contact: ###-####. recepticle outlet wired incorrectly. called contractor to correct. 2/26/2002 12:04:50 PM
|
Final | 2/25/2002 | 2/26/2002 | 2/26/2002 | A | FAIL |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 07:57:14. Contact: ###-####. recepticle outlet wired incorrectly. called contractor to correct. 2/26/2002 12:04:50 PM
|
Final | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 12:09:28. Contact: ###-####. temporary occupancy; modular cubicles not completed. 2/20/2002 3:36:52 PM
|
Final | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 09:45:52. Contact: ###-####. temporary occupancy. 2/19/2002 9:15:56 AM
|
Electrical Rough-In | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 07:53:34. Contact: ###-####. ceiling r/i; check recessed fixture for suppot wire on final. ok. 1/11/2002 11:41:18 AM
|
Electrical Rough-In | 12/7/2001 | 12/10/2001 | 12/10/2001 | A | PASS |
Marv Burrus
|
|
|
###-####. interior walls r/i, 2nd floor. 12/10/2001 8:59:59 AM
|
Electrical Rough-In | 12/4/2001 | 12/4/2001 | 12/4/2001 | P | PART |
Marv Burrus
|
|
|
###-#### kelley 2nd floor. perimeter walls r/i. 12/4/2001 1:31:36 PM
|