DOC - Permit Finaled | | | 10/18/2002 | | DONE |
|
|
|
already fn
|
Final | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 17:09:02. Contact: ###-####.
|
Electrical Rough-In | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PASS |
Joe Ray
|
|
|
###-#### jim p/s ug n ok 12/21/2001 9:45:53 AM
|
Rough-In Permanent Service | 12/11/2001 | 12/12/2001 | 12/12/2001 | P | FAIL |
Joe Ray
|
|
|
jim- ###-#### 300-22 electical in plenum/ called contr 12/12/2001 2:48:48 PM
|