Final | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | PASS |
Jack Frank
|
|
|
WARREN ###-#### ok 5/6/2002 1:48:03 PM
|
Permanent Service | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Jack Frank
|
|
|
###-#### p/s u/g rec. ok 1/11/2002 2:02:08 PM
|
Rough-In Permanent Service | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 07:39:05. Contact: ###-####. cor. posted called 300-20(a) 250-66 1/9/2002 10:07:54 AM
|
Electrical Rough-In | 1/8/2002 | 1/8/2002 | 1/8/2002 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 1/8/2002 1:19:54 PM conference with power elect
|
Final | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | FAIL |
Pat Lass
|
|
|
###-#### grounding bonding and neutral to disconnect 1/8/2002 10:56:49 AM
|
Electrical Rough-In | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | FAIL |
Jack Frank
|
|
|
Added by Inspector: 315 On 1/2/2002 1:46:28 PM shall not ID #8 blk in new subpanel feed 400 amp meter base with proper size wire for proper ampacity called
|
Final | 12/13/2001 | 12/14/2001 | 12/14/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### called need to meet contractor no access to service gear and sub panel grounding all messed up see JF for details cow 12/14/2001 11:26:08 AM
|