Final | 1/28/2002 | 1/29/2002 | 1/29/2002 | A | PASS |
Pat Lass
|
|
|
###-####
|
Final | 1/26/2002 | 1/28/2002 | 1/28/2002 | A | NH |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/26/2002 at 15:03:14. Contact: ###-####. called but got a mach. that didn't give time for message 1/28/2002 9:58:27 AM
|
Electrical Rough-In | 12/30/2001 | 12/31/2001 | 12/31/2001 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 12/30/2001 at 22:27:55. Contact: .
|
Electrical Rough-In | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 16:44:59. Contact: . cor. posted called 210-52 (a),(b) 250-50,54,56, 370-20,300-4, 210-11(c) (3) see JF if ? 12/28/2001 11:24:59 AM
|