Final | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Jack Frank
|
|
|
###-#### ok 1/9/2002 1:52:25 PM
|
Permanent Service | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 1/9/2002 1:52:59 PM p/s o/h rec. ok
|
Final | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | FAIL |
Jack Frank
|
|
|
###-#### cor. posted called 680-40& 400-8 flex, and cord not allowed to feed spa and 110-12 seal KO in p/s 1/7/2002 3:02:48 PM
|
Final | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | FAIL |
Jack Frank
|
|
|
###-#### CRAIG needs to bond all metal around spa with #8 solid , and install gfci receptacle and verify gec connection to water system called cor. posted 12/20/2001 1:03:11 PM
|
Final | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 12/17/2001 at 10:32:50. Contact: ###-####. 680-25 insulated grd wire/680-22 bond metal/680-6 recpt 10 ft/110-3 manuf. wire size/250 two grd rods/guy on mast 12/17/2001 3:13:49 PM
|