Final | 6/6/2002 | 6/6/2002 | 6/6/2002 | P | PASS |
Tim McCullough
|
|
|
insp for front portion -andy ###-####-re-insp
|
Final | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | FAIL |
Jack Frank
|
|
|
###-####- john fn cor. posted called needs a permit for each tenant space, 210.8 (B) gfci all bath rm receptacles, 406.4 recepts are loose, and set back in plates 4/25/2002 4:42:00 PM
|
Electrical Rough-In | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 14:59:38. Contact: ###-####. ok 1/30/2002 11:02:30 AM
|
Electrical Rough-In | 1/4/2002 | 1/7/2002 | 1/7/2002 | P | PART |
Jack Frank
|
|
|
###-#### r/i in some areas ok 1/7/2002 2:32:12 PM
|
Electrical Rough-In | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | PART |
Jack Frank
|
|
|
###-####\\call first conference ok 12/31/2001 11:27:39 AM
|