Final | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/15/2002 at 08:09:19. Contact: .
|
Permanent Service | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 09:48:06. Contact: ###-####. P/S U/G N Ok 1/3/2002 2:33:53 PM
|
Permanent Service | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/02/2002 at 07:56:51. Contact: ###-####. cor. posted called 373-5(c) cabled shall enter panel in approved connectors shall not install them in one big connector 1/2/2002 3:36:45 PM
|
Electrical Rough-In | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PASS |
Pat Lass
|
|
|
###-#### check cables going into service 12/27/2001 5:21:13 PM
|