Final | 4/10/2002 | 4/12/2002 | 4/12/2002 | A | PASS |
Jack Frank
|
|
|
therrin ###-#### please sign off in trailer ok 4/12/2002 4:01:45 PM
|
Rough-In Permanent Service | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 11:19:24. Contact: ###-####. P/S U/G N Ok 1/22/2002 10:53:51 AM
|
Rough-In Permanent Service | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 09:01:35. Contact: ###-####. called needs more nail plating above panels and remove low voltage conduits from below p/s 1/18/2002 5:55:01 PM
|