Final | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/05/2002 at 17:42:16. Contact: ###-####.
|
Rough-In Permanent Service | 1/4/2002 | 1/7/2002 | 1/7/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 12:42:23. Contact: ###-####. p/s ug n ok 1/7/2002 9:44:43 AM
|
Electrical Rough-In | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | FAIL |
Joe Ray
|
|
|
not ready 12/28/2001 10:17:04 AM
|