Final | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | PASS |
Joe Ray
|
|
|
###-#### bill
|
Final | 8/28/2002 | 8/29/2002 | 8/29/2002 | P | FAIL |
Jack Frank
|
|
|
fn -bill ###-#### cor. and $45.00 reinspection fee due posted called 410.8 clearence closet light, and switch, and timer for whole house fan shall be wired in parallel, not series 8/29/2002 6:29:24 PM
|
Final | 6/24/2002 | 6/24/2002 | 6/24/2002 | P | FAIL |
Joe Ray
|
|
|
bill ###-#### not ready called 6/24/2002 2:58:14 PM
|
Electrical Rough-In | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | FAIL |
Jack Frank
|
|
|
BILL ###-#### sub panel in warm wall called contractor 1/16/2002 10:56:51 AM
|
Electrical Rough-In | 1/16/2002 | 1/16/2002 | 1/16/2002 | P | PASS |
Jack Frank
|
|
|
###-#### r/i ok 1/16/2002 1:13:54 PM
|
Electrical Rough-In | 1/14/2002 | 1/15/2002 | 1/15/2002 | P | FAIL |
Jack Frank
|
|
|
BILL ###-#### cor.and $42.00 reinspection fee due posted called 314.16 box fill 2 gang boxes in garages, and 110.12 (a) seal unused openings in non metallic boxes 1/15/2002 4:30:32 PM
|
Electrical Rough-In | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | NR |
Pat Lass
|
|
|
BILL ###-####
|
Electrical Rough-In | 1/11/2002 | 1/14/2002 | 1/14/2002 | A | FAIL |
Pat Lass
|
|
|
###-####- bill r/i corrections not made 1/14/2002 10:02:15 AM
|
Electrical Rough-In | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | NR |
Pat Lass
|
|
|
BILL ###-####9 had conf 1/14/2002 2:55:30 PM
|
Permanent Service | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Pat Lass
|
|
|
Added by Inspector: 336 On 1/11/2002 3:18:50 PM P/S u/G N Ok
|
Rough-In Permanent Service | 1/9/2002 | 1/10/2002 | 1/10/2002 | P | FAIL |
Pat Lass
|
|
|
###-#### protection free conductor and box fill 1/10/2002 5:20:58 PM
|