Final | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/14/2002 at 08:28:16. Contact: ###-####.
|
Final | 2/12/2002 | 2/13/2002 | 2/13/2002 | A | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 18:23:16. Contact: ###-####. correction 406.8(b)(1) 2/13/2002 10:11:12 AM
|
Electrical Rough-In | 1/2/2002 | 1/7/2002 | 1/7/2002 | A | PASS |
Joe Ray
|
|
|
###-#### p/s ug n ok 1/7/2002 11:56:54 AM
|