Final | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 11:31:53. Contact: ###-####.
P/S O/H R Ok 3/1/2002 11:11:08 AM
|
Rough-In Permanent Service | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 11:15:44. Contact: ###-####. posted correction grounding bonding clearance 110-3 COW 2/7/2002 3:28:52 PM
|
Electrical Rough-In | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | NR |
Pat Lass
|
|
|
conf. only\\###-#### or ###-####
|