Final | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/24/2002 at 10:13:01. Contact: ###-####.
|
Final | 9/19/2002 | 9/19/2002 | 9/19/2002 | P | PASS |
Tim McCullough
|
|
|
Scheduled by a contractor via Hello! on 09/19/2002 at 08:23:48. Contact: ###-####.
final ok 9/19/2002 3:43:15 PM
|
Electrical Rough-In | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/10/2002 at 09:19:26. Contact: ###-####. ceiling cover ok 7/10/2002 1:05:21 PM
|
Electrical Rough-In | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 14:24:41. Contact: ###-####. transformer on roof ok 6/14/2002 11:30:35 AM
|
Permanent Service | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 09:47:02. Contact: ###-####. p/s ug n ok 6/12/2002 4:04:22 PM
|
Electrical Rough-In | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 15:40:02. Contact: ###-####.
|
Rough-In Permanent Service | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 15:32:10. Contact: ###-####. east wing 5/17/2002 10:07:42 AM
|
Rough-In Permanent Service | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 07:57:15. Contact: ###-####. east wing and partial for gym 5/16/2002 1:52:08 PM
|
Rough-In Permanent Service | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/06/2002 at 13:50:35. Contact: ###-####. cad weld below panels where xformer is on roof 5/7/2002 12:15:59 PM
|
Electrical Rough-In | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 08:17:54. Contact: ###-####.
North end walls ok 5/1/2002 4:29:36 PM
|
Electrical Rough-In | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 08:13:22. Contact: ###-####. conf only 3/22/2002 5:40:30 PM
|
Electrical Rough-In | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/13/2002 at 15:28:24. Contact: ###-####.partial U/ G ok 3/14/2002 11:42:34 AM
|
Electrical Rough-In | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 10:40:16. Contact: ###-####. u/g ok
3/14/2002 4:47:18 PM
|
Electrical Rough-In | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 10:44:49. Contact: ###-####.
|
Electrical Rough-In | 3/6/2002 | 3/7/2002 | 3/7/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 14:07:06. Contact: ###-####.
U/G Ok 3/7/2002 12:38:58 PM
|
Electrical Rough-In | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 09:48:11. Contact: ###-####. poor back fill 3/6/2002 4:24:22 PM
|
Electrical Rough-In | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 09:32:59. Contact: ###-####.
|
Electrical Rough-In | 2/19/2002 | 2/19/2002 | 2/19/2002 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 08:25:52. Contact: ###-####. more tip-ups 2/19/2002 3:36:44 PM
|
Electrical Rough-In | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 11:36:13. Contact: ###-####. 5 tip-ups ok 2/14/2002 10:47:14 AM
|
Electrical Rough-In | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/24/2002 at 15:14:41. Contact: ###-####.
|
Electrical Rough-In | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 01/23/2002 at 15:36:55. Contact: ###-####. u/g to outside lights and electrode 1/24/2002 10:51:07 AM
|
Electrical Rough-In | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 16:50:26. Contact: ###-####. concrete encased electrode ok 1/10/2002 11:47:02 AM
|