Final | 2/11/2002 | 2/11/2002 | 2/11/2002 | P | PASS |
Jack Frank
|
|
|
fn insp taylor ###-#### ok 2/11/2002 4:38:42 PM
|
Rough-In Permanent Service | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | PART |
Jack Frank
|
|
|
###-#### mike (CONFERENCE ) r/i for both units fire job RME will call for inspection for repair work of heat panels and SER cable when ready 1/18/2002 3:52:58 PM
|
Electrical Rough-In | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | NR |
Pat Lass
|
|
|
JACK WILL YOU PLEASE CHECK THIS I THINK IT NEEDS A BLD PERMIT, THANKS RAD. ###-####\\CONF. ONLY had conf 1/18/2002 11:42:49 AM
|