Final | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | PASS |
Jack Frank
|
|
|
###-#### final ok core and shell 4/11/2002 4:41:58 PM
|
Final | 4/10/2002 | 4/10/2002 | 4/10/2002 | P | PART |
Jack Frank
|
|
|
###-#### no T/O
4/10/2002 5:36:26 PM
|
Electrical Rough-In | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | PART |
Jack Frank
|
|
|
CEILING INSPECT ON NORTH SIDE ALLISON ###-#### ok 3/20/2002 1:31:48 PM
|
Electrical Rough-In | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | PART |
Jack Frank
|
|
|
###-#### ALISON PARTIAL interior walls ok 2/4/2002 3:55:49 PM
|
Electrical Rough-In | 1/28/2002 | 1/29/2002 | 1/29/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 12:56:00. Contact: ###-####. soffit lights ok 1/29/2002 10:54:12 AM
|
Electrical Rough-In | 1/24/2002 | 1/28/2002 | 1/28/2002 | A | PART |
Jack Frank
|
|
|
###-#### DELBERT exterior walls only ok 1/28/2002 10:34:22 AM
|
Electrical Rough-In | 1/22/2002 | 1/23/2002 | 1/23/2002 | A | PART |
Jack Frank
|
|
|
ufer grd. ###-#### connection to electrode ok, needs to terminate it in neutral bus 1/23/2002 9:59:15 AM
|
Rough-In Permanent Service | 1/18/2002 | 1/22/2002 | 1/22/2002 | P | PART |
Pat Lass
|
|
|
###-#### ###-####partial U/G Ok to fill to ribbon 1/22/2002 4:49:30 PM
|