Final | 7/2/2002 | 7/2/2002 | 7/2/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 10:07:41. Contact: ###-####.
|
Final | 6/7/2002 | 6/10/2002 | 6/10/2002 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 16:31:36. Contact: ###-####. needs outlet for wall space left of cabinet where you enter house label panels and install blank cover called 6/10/2002 5:38:40 PM
|
Electrical Rough-In | 5/21/2002 | 5/22/2002 | 5/22/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 11:57:34. Contact: ###-####. library ok r/i 5/22/2002 5:13:23 PM
|
Permanent Service | 5/7/2002 | 5/8/2002 | 5/8/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 09:29:22. Contact: ###-####.
P/S O/H R Ok 5/8/2002 2:30:20 PM
|