Final | 4/20/2004 | 4/21/2004 | 4/21/2004 | A | PASS |
Jack Frank
|
|
|
CONTACT: GREG OYAMA - CALL BEFORE GOING SO GREG CAN MEET YOU THERE. THANK YOU; Phone #: ###-#### Internet Inspection Request from: Deb McCoy final ok for perm. occupancy left signed and dated final sticker to be placed on card, could not locate card 4/21/2004 10:45:10 AM
|
Final | 3/25/2004 | 3/25/2004 | 3/25/2004 | P | PART |
Jack Frank
|
|
|
###-#### steve people moved n o access too areas 3/25/2004 4:07:09 PM
|
ELE-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 | | NR |
Joe Ray
|
|
|
still under crontr 12/16/2002 10:25:47 AM
|
Electrical Rough-In | 3/28/2002 | 3/29/2002 | 3/29/2002 | P | PART |
Pat Lass
|
|
|
for 2 walls on 2nd fl- bud- pager ###-####
|
Electrical Rough-In | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PASS |
Joe Ray
|
|
|
###-#### bud
|
Electrical Rough-In | 2/14/2002 | 2/14/2002 | 2/14/2002 | P | PASS |
Joe Ray
|
|
|
BUD PAGER ###-####
|
Electrical Rough-In | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 11:24:15. Contact: ###-####.
|
Electrical Rough-In | 2/1/2002 | 2/4/2002 | 2/4/2002 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/01/2002 at 13:35:08. Contact: ###-####. ceiling 2/4/2002 10:27:41 AM
|
Electrical Rough-In | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PART |
Pat Lass
|
|
|
ceiling cover 1st floor\\###-#### ok except 2 tiles 1/29/2002 2:57:32 PM
|
Electrical Rough-In | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | PASS |
Joe Ray
|
|
|
###-#### walls ok for cover 1/23/2002 4:02:43 PM
|