Final | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 17:20:20. Contact: ###-####.
|
Final | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 10:44:25. Contact: ###-####. grounding and fittings rain tight and 90 deg in middle of runs 2/28/2002 1:07:20 PM
|
Final | 2/27/2002 | 2/27/2002 | 2/27/2002 | P | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 10:41:25. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/27/2002 at 10:42:33.
|