Final | 6/6/2002 | 6/6/2002 | 6/6/2002 | P | PASS |
Tim McCullough
|
|
|
fn insp- ###-#### randy
|
Final | 6/4/2002 | 6/5/2002 | 6/5/2002 | P | PASS |
Tim McCullough
|
|
|
###-####
|
Final | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | NR |
Tim McCullough
|
|
|
|
Final | 5/14/2002 | 5/15/2002 | 5/15/2002 | A | PART |
Jack Frank
|
|
|
###-#### RANDY temp ok cor. posted security rm 400.8(5) 5/15/2002 2:10:31 PM
|
Electrical Rough-In | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | PART |
Jack Frank
|
|
|
MOUNTING OF EXTERIOR LIGHT FIXTURES (###-####)RANDY store wide r/i ok need outlets on for hvac within 25 ft of units 210.63, note the way they will feed fixtures with cable ok no boxes are required 5/6/2002 6:02:17 PM
|
Electrical Rough-In | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | PART |
Jack Frank
|
|
|
###-#### RANDY pole bases ok 4/30/2002 10:52:22 AM
|
Electrical Rough-In | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Pat Lass
|
|
|
floor boxes, exit and emergency lighting, doc webbler, boxes general ###-#### late pm
|
Electrical Rough-In | 4/19/2002 | 4/19/2002 | 4/19/2002 | P | CANC |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 08:17:23. Contact: ###-####. had no idea what to look at and contractor said to cancel and resceduled for monday.-jms 4/19/2002 12:07:08 PM
|
Electrical Rough-In | 4/15/2002 | 4/18/2002 | 4/18/2002 | P | PART |
Pat Lass
|
|
|
ed ###-#### --t/occ
|
Electrical Rough-In | 4/15/2002 | 4/17/2002 | 4/17/2002 | P | PART |
Pat Lass
|
|
|
ed -wall cover ###-####
|
Electrical Rough-In | 4/15/2002 | 4/16/2002 | 4/16/2002 | P | PART |
Pat Lass
|
|
|
wall cover --ed ###-####
|
Electrical Rough-In | 4/16/2002 | 4/16/2002 | 4/16/2002 | A | PART |
Pat Lass
|
|
|
|
Electrical Rough-In | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | PART |
Pat Lass
|
|
|
ceiling insp & partial pathway--tower elec ###-####
|
Electrical Rough-In | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | PART |
Pat Lass
|
|
|
parking lot ###-#### randy
|
Electrical Rough-In | 4/10/2002 | 4/10/2002 | 4/10/2002 | P | PART |
Pat Lass
|
|
|
trenching \\###-#### randy
|
Permanent Service | 4/8/2002 | 4/9/2002 | 4/9/2002 | A | NR |
Pat Lass
|
|
|
per ser- ###-#### --tower elec-also partial trenching bonding incomplete had conf 4/9/2002 11:05:31 AM
|
Permanent Service | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | PASS |
Pat Lass
|
|
|
per ser & partial trench ###-####--randy -re-insp
P/S U/G R ok 4/9/2002 4:42:54 PM
|
Electrical Rough-In | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | PART |
Pat Lass
|
|
|
partial parking lot trench cover- ###-#### -randy requires clean fill 4/3/2002 2:59:10 PM
|
Electrical Rough-In | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PART |
Pat Lass
|
|
|
GROUND WORK SOUTH END OF BUILDING ###-#### RANDY
|
Electrical Rough-In | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PASS |
Pat Lass
|
|
|
###-#### RANDY ROOMS AT NE CORNER OF BUILDING
|
Electrical Rough-In | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PART |
Pat Lass
|
|
|
###-#### UFER BOND RANDY
2 walls and "u" fer ok 3/14/2002 11:41:49 AM
|
Electrical Rough-In | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | PART |
Pat Lass
|
|
|
###-#### RANDY
SE restrooms ok 3/6/2002 3:24:47 PM
|
Electrical Rough-In | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PART |
Marv Burrus
|
|
|
for groundwork--randy -###-####. pvc conduit in trench; ok for cover, north/northwest. 2/15/2002 1:47:35 PM
|
Electrical Rough-In | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Mike Kinnear
|
|
|
ground work\\###-#### ok cover part underground northwest area 2/12/2002 1:24:21 PM
|
Electrical Rough-In | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | PART |
Pat Lass
|
|
|
###-#### RANDY party wall ok 2/7/2002 5:08:57 PM
|
Electrical Rough-In | 2/1/2002 | 2/4/2002 | 2/4/2002 | A | PART |
Pat Lass
|
|
|
for a conf-- ###-####- randy
|