Final | 3/13/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/13/2002 at 16:02:45. Contact: ###-####. final ok could not locate card called left # message 3/14/2002 2:09:07 PM
|
Final | 2/28/2002 | 3/1/2002 | 3/1/2002 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 10:44:13. Contact: ###-####. signed T/O 3/4/2002 10:45:28 AM
|
Electrical Rough-In | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 08:48:55. Contact: ###-####.
|
Electrical Rough-In | 2/14/2002 | 2/15/2002 | 2/15/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/14/2002 at 16:03:36. Contact: ###-####. recess cans in entry 2/15/2002 2:37:27 PM
|
Electrical Rough-In | 2/4/2002 | 2/5/2002 | 2/5/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 10:47:16. Contact: ###-####. bathroom area ok 2/5/2002 11:36:53 AM
|
Electrical Rough-In | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 15:11:20. Contact: ###-####. exterior walls waiting room 1/31/2002 12:58:09 PM
|