Final | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 10:38:41. Contact: ###-####.
|
Electrical Rough-In | 8/14/2002 | 8/15/2002 | 8/15/2002 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/14/2002 at 12:12:15. Contact: ###-####.
walls phase 3 ok 8/15/2002 9:43:59 AM
|
Electrical Rough-In | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 13:25:23. Contact: ###-####. ok cover second section walls advised diana that nec 800.5&.6 are being inforced 7/2/2002 10:18:26 AM
|
Electrical Rough-In | 3/11/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 12:52:16. Contact: ###-####. 1st floor: h.i.s. dictation, walls r/i. 3/12/2002 1:38:04 PM
|