Final | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 17:12:22. Contact: ###-####.
|
Final | 3/29/2002 | 4/1/2002 | 4/1/2002 | A | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 17:28:00. Contact: ###-####. contractor will reschedule. 4/1/2002 10:12:19 AM
|
Final | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 09:58:19. Contact: ###-####. temporary occupancy only. 3/22/2002 2:47:01 PM
|
Electrical Rough-In | 2/21/2002 | 2/22/2002 | 2/22/2002 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 14:28:05. Contact: ###-####. walls r/i. 2/22/2002 11:42:35 AM
|