Final | 5/21/2004 | 5/24/2004 | 5/24/2004 | A | PASS |
Pat Lass
|
|
|
dana; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
Final | 2/26/2004 | 2/27/2004 | 2/27/2004 | A | FAIL |
Pat Lass
|
|
|
fn insp
outlet required above counter to the right of range 2/27/2004 9:42:33 AM
|
Extend Permit 180 days | | 6/2/2003 | 6/2/2003 | | DONE |
Pat Lass
|
|
|
Per homeowner, needs about 2 more months to finish this house. Permit extended.
|
Electrical Rough-In | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Jim Schmer
|
|
|
ok to cover -###-####- john
|
Rough-In Permanent Service | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | PART |
Mike Kinnear
|
|
|
###-#### JOHN
p/s u/g n ok
ri not completed 2/20/2002 1:35:53 PM
|
Electrical Rough-In | 2/19/2002 | 2/19/2002 | 2/19/2002 | P | PART |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 02/19/2002 at 08:18:05. Contact: ###-####. conference only. 2/19/2002 10:30:38 AM
|
Rough-In Permanent Service | 2/15/2002 | 2/19/2002 | 2/18/2002 | A | CANC |
Mike Kinnear
|
|
|
###-#### Disp set to [CANC] by a contractor via Hello! on 02/18/2002 at 15:26:07.
|
Electrical Rough-In | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | PASS |
Jim Schmer
|
|
|
###-#### mark conference 2/15/2002 9:16:01 AM
|