Final | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | PASS |
Pat Lass
|
|
|
MARK ###-####
|
Final | 6/24/2002 | 6/24/2002 | 6/24/2002 | P | FAIL |
Pat Lass
|
|
|
mark ###-####
boxes not flush 6/24/2002 4:26:41 PM
|
Final | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | NR |
Pat Lass
|
|
|
partial fn mark -###-####
boxes flush and support smoke detectors 6/18/2002 10:58:08 AM
|
Electrical Rough-In | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/10/2002 at 16:18:59. Contact: ###-####. wrong # 6/11/2002 11:29:10 AM
|
Electrical Rough-In | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | PART |
Pat Lass
|
|
|
ceiling cover- mark pager ###-####
area noted on print 5/28/2002 5:30:35 PM
|
Electrical Rough-In | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | FAIL |
Pat Lass
|
|
|
###-#### ceiling cover
Open boxes without grounding pigtails and no support of MC within 12 in. of box 5/21/2002 3:32:05 PM
|
Electrical Rough-In | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Marv Burrus
|
|
|
###-#### MARK 4-core south, walls r/i. 4/8/2002 10:52:57 AM
|