Final | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PASS |
Pat Lass
|
|
|
###-####
P/S U/G N Ok 3/1/2002 10:38:54 AM 3/1/2002 10:39:07 AM
|
Electrical Rough-In | 2/22/2002 | 2/25/2002 | 2/25/2002 | A | PART |
Pat Lass
|
|
|
###-#### RYAN UNDER GROUND COVER
|
Electrical Rough-In | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PART |
Pat Lass
|
|
|
###-#### electrode ok for concrete and U/G Ok 2/25/2002 5:38:23 PM
|