Final | 4/9/2002 | 4/9/2002 | 4/9/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 07:50:28. Contact: ###-####.
|
Electrical Rough-In | 3/26/2002 | 3/27/2002 | 3/27/2002 | A | PASS |
Marv Burrus
|
|
|
###-#### DALE walls r./i. 3/27/2002 11:00:16 AM
|
Final | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 07:43:47. Contact: ###-####. temp/occup 3/14/2002 4:12:18 PM
|
Electrical Rough-In | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 08:18:07. Contact: ###-####.
|