Permit Information
Permit NumberELE02-00517
StatusFinaled
Name QUALITY ELECTRIC INC
Site Address 8000 S FEDERAL WAY
Project NameMICRON
Customer Number 
ePlanReview 
Description
ELECTRICAL AND FIRE ALARM INSTALLATION PER INITIAL CERT OF VALUE $2,728,515.00
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Electrical Rough-In10/10/200210/10/200210/10/2002PCANC
DetailsMike Kinnear
Phone #: ###-#### Internet Inspection Request from: Amy Lawson wrong type inspection 10/10/2002 3:33:50 PM
Final10/10/200210/10/200210/10/2002PPASS
DetailsMike Kinnear
ok final
Final10/1/200210/2/200210/2/2002APART
DetailsMike Kinnear
renee ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie part final peluim over clean rm ok 10/2/2002 11:26:45 AM
Final9/23/20029/23/20029/23/2002PPART
DetailsMike Kinnear
RENEE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok final areas sub fab rm003B, scrubber rm001I, scrubber fan deck, corridors 3rd floor, mech rm 3rd floor,& litho support rm109B 9/23/2002 6:45:27 PM
Final9/3/20029/4/20029/4/2002ADONE
DetailsJack Frank
Scheduled by a contractor via Hello! on 09/03/2002 at 11:55:55. Contact: ###-####. called no inspection needed 9/4/2002 1:51:05 PM
Final8/30/20029/3/20029/3/2002PPART
DetailsJack Frank
RENE; Phone #: ###-#### Internet Inspection Request from: Darla Downs needs to bond exposed metel conduit at pole, interiorpiping bonding ok 9/3/2002 6:17:05 PM
Final8/23/20028/23/20028/23/2002PPART
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 08/23/2002 at 07:58:06. Contact: ###-####. part final rooms 101P, 101W, 101L, 110A, 112B, 1112A, 1101H, 101I, scrubber fan deck, 106B, 101C, 109A, 002A, 001B, 001C, 001D, 001E, 001H, 001G, 002B, 101N 8/23/2002 3:19:55 PM
Final8/1/20028/5/20028/5/2002ANR
DetailsMike Kinnear
RENE; Phone #: ###-#### not ready 8/5/2002 9:41:28 AM
Final7/29/20027/30/20027/30/2002APART
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 07/29/2002 at 11:35:02. Contact: ###-####. ok part finalplenium southside, mech rm 101D, stairs 1,2,3, office area all, venders rm cori. adj. office, batrms 101UV, janitor rm 101M, fmcs rm 101R, stairs 4,5,6. 7/30/2002 9:46:58 AM
Final7/26/20027/26/20027/26/2002PPART
DetailsMike Kinnear
per mike fn conf with dan 7/26/2002 4:46:29 PM
Final7/19/20027/19/20027/19/2002PPART
DetailsMike Kinnear
rene; Phone #: ###-#### ok temp. occ. office area note lockouts for water cooler & insta h2o heaters-- spark rings for some wall switches & outlets 7/19/2002 5:05:24 PM
Final7/15/20027/15/20027/15/2002PFAIL
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 07/15/2002 at 08:28:26. Contact: ###-####. correction NEC 400.8 part 7/15/2002 3:30:36 PM
Electrical Rough-In7/11/20027/12/20027/12/2002APART
DetailsMike Kinnear
TEMP FINAL RENE ###-#### ok cover part ceiling rms 104B & 104F CORIDOR 100D 7/12/2002 3:43:00 PM
Electrical Rough-In7/12/20027/12/20027/12/2002PPART
DetailsMike Kinnear
R/I- RENE- ###-#### CELL ok cover part ceiling coridor 100B, ves.100A, rms 103B & 102A 7/12/2002 3:45:46 PM
Electrical Rough-In7/1/20027/2/20027/2/2002APART
DetailsMike Kinnear
RENE ###-#### pre inspection ceiling 7/2/2002 8:13:35 AM
Electrical Rough-In7/2/20027/2/20027/2/2002PPART
DetailsMike Kinnear
RENE ###-#### CELING ok cover ceiling except for rms 104B & 104F 7/2/2002 3:37:50 PM 7/2/2002 3:38:24 PM
Electrical Rough-In6/27/20026/27/20026/27/2002PPART
DetailsMike Kinnear
r/i- renee ###-#### ok pre final inspection 6/27/2002 12:20:59 PM
Electrical Rough-In6/20/20026/20/20026/20/2002PPART
DetailsMike Kinnear
###-#### RENE ok cover walls locker room 6/20/2002 12:26:26 PM
Electrical Rough-In6/19/20026/19/20026/19/2002PPASS
DetailsMike Kinnear
per mike r/i & conf ok conf. 6/19/2002 3:59:08 PM
Electrical Rough-In6/12/20026/12/20026/12/2002PPART
DetailsMike Kinnear
RENE ###-#### ok cover bathroom ceilings 6/12/2002 1:17:16 PM
Electrical Rough-In6/4/20026/6/20026/6/2002ACANC
DetailsMike Kinnear
rene ###-#### canc by contractor 6/6/2002 8:29:11 AM
Electrical Rough-In6/5/20026/5/20026/5/2002PPASS
DetailsJim Schmer
r/i- rene- ###-#### -per rene give to jim 6/5/2002 12:11:46 PM
Electrical Rough-In6/4/20026/5/20026/5/2002ACANC
DetailsMike Kinnear
RENE ###-#### t/w rene ok change inspection for 5/6/02 am 6/4/2002 5:43:17 PM
Electrical Rough-In5/30/20025/31/20025/31/2002APART
DetailsMike Kinnear
###-#### RENAE part ok cover ex wall s&w corner1st floor 5/31/2002 2:23:48 PM
Electrical Rough-In5/30/20025/30/20025/30/2002PPART
DetailsMike Kinnear
wall r/i- renea- ###-#### part ok cover walls rms 104 H,I,J,K,&L rm 100Y&X 5/30/2002 3:01:38 PM
Rough-In Permanent Service5/16/20025/17/20025/17/2002APASS
DetailsJim Schmer
RENE ###-#### Looked at 3 mains for length and connection, 2 still need cond. pulled. Having 3 megged over weekend. 5/17/2002 9:16:47 AM
Rough-In Permanent Service5/10/20025/13/20025/13/2002AFAIL
DetailsMike Kinnear
rene ###-#### transformers NEC450.21(B) 5/13/2002 8:56:44 AM
Electrical Rough-In5/10/20025/10/20025/10/2002PPART
DetailsMike Kinnear
RENE ###-#### ok cover walls stair 100J, 106P,101C, 101E, 104C, 101F, part corr. 100D, part 110A, part 101P. 5/10/2002 3:22:14 PM
Electrical Rough-In5/2/20025/3/20025/3/2002APART
DetailsMike Kinnear
conference Dion ###-#### conf regarding transformer bonding & grounding 5/3/2002 8:30:50 AM
Electrical Rough-In4/23/20024/24/20024/24/2002APART
DetailsMike Kinnear
deeon- ###-#### r/i ok cover walls only 3rd floor preim. walls, level 1 clean rm. ext walls,100D & 100E corridors, 3rd floor int. waffles slab walls , toilets 100U & V, jant rm 101M 4/24/2002 10:24:45 AM
Electrical Rough-In4/11/20024/11/20024/11/2002PPART
DetailsMike Kinnear
wall cover ###-#### deeon ok cover walls only lobby100B part, corr. 100C part, 104D part,102A, 105b PART, 112A, 112B, 112C, 100B, 101J part, storage 110A part, HPM aisle 002B, 001G, 001H, 001H, 000A stair6, 001F, 001E, 001D, 001C, 001B, 002A, & stair5 000F part. 4/11/2002 2:05:57 PM
Electrical Rough-In4/2/20024/3/20024/3/2002APART
DetailsMike Kinnear
deeon- cell ###-#### ok cover ones wall sub fab aisle 003A, HPM aisle vestibule 002C one side, & main switch gear rm 101K walls only 4/3/2002 9:28:11 AM
Electrical Rough-In3/19/20023/20/20023/20/2002APART
DetailsMike Kinnear
underground insp deeon- cell ###-#### ok cover underground for pimmary power 3/20/2002 8:02:02 AM