Final | 6/5/2002 | 6/5/2002 | 6/5/2002 | P | PASS |
Tim McCullough
|
|
|
re-insp fn -done at 12--mark- ###-####
|
Final | 6/3/2002 | 6/4/2002 | 6/4/2002 | A | FAIL |
Tim McCullough
|
|
|
jeff ###-####
corr. line&load rev. upstairs bath gfci called contr. 6/4/2002 12:32:02 PM
|
Electrical Rough-In | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 13:04:44. Contact: . r/i only no p/s called 3/11/2002 10:43:42 AM
|
Electrical Rough-In | 3/6/2002 | 3/7/2002 | 3/7/2002 | A | FAIL |
Jack Frank
|
|
|
###-#### PATRICK corrections not made called will meet contractor at 1:00 pm for conference 3/7/2002 11:38:32 AM
|
Electrical Rough-In | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PART |
Jack Frank
|
|
|
r/i -re-insp -david ###-#### conference ok needs to remove outside outlets and hall outlet from kit circuit, and provide 6 inches free lenth conductors at all boxes as code states 3/7/2002 3:51:34 PM
|
Rough-In Permanent Service | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | FAIL |
Pat Lass
|
|
|
###-#### DAVE BUDGET ELECTRIC
protection box fill unused oenings electrode
Posted correction 3/5/2002 11:40:06 AM
|