Final | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PASS |
Marv Burrus
|
|
|
fn dale- ###-#### grounding completed. 3/8/2002 1:32:15 PM
|
Rough-In Permanent Service | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PASS |
Marv Burrus
|
|
|
###-#### DALE
p/s oh re capitol ele #0594-ok
idaho power connected to power after inspection, ok.
3/7/2002 3:26:29 PM
|
Rough-In Permanent Service | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PASS |
Marv Burrus
|
|
|
###-#### DALE
p/s oh re capitol ele #0594-ok
idaho power connected to power after inspection, ok.
3/7/2002 3:26:29 PM
|