Final | 3/31/2003 | 4/1/2003 | 4/1/2003 | A | PASS |
Joe Ray
|
|
|
###-####
|
Final | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | FAIL |
Jack Frank
|
|
|
DAN; Phone #: ###-#### Internet Inspection Request from: Annette Moore cor. posted called 410.14 (B) needs access too box, covered by fixture, 110.12 (A) seal all unused openings 3/28/2003 2:03:23 PM
|
ELE-Aging Inspection | 2/27/2003 | 2/27/2003 | 2/27/2003 | | PART |
Jack Frank
|
|
|
wsuc 2/27/2003 7:42:12 AM
|
ELE-Aging Inspection | 12/16/2002 | 12/16/2002 | 12/16/2002 | | PART |
Jack Frank
|
|
|
W S U C 12/16/2002 2:03:54 PM
|
Final | 8/23/2002 | 8/23/2002 | 8/23/2002 | P | CANC |
Jack Frank
|
|
|
###-#### dan no final see added p/s 8/23/2002 5:42:48 PM
|
Permanent Service | 8/23/2002 | 8/23/2002 | 8/23/2002 | P | PASS |
Jack Frank
|
|
|
p/s u/g new ok
|
Permanent Service | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | FAIL |
Jack Frank
|
|
|
Phone #: ###-#### cor. posted called all corrections not made and needs to bond nipples with #2 as 250.66 states stills needs to install locknuts to meet intent of 300.10,and 12 8/22/2002 12:05:51 PM
|
Permanent Service | 8/6/2002 | 8/6/2002 | 8/6/2002 | P | FAIL |
Jack Frank
|
|
|
cor. , and $45.00 reinspection fee due posted called left message 300.10, and 14 use locknuts inside and outside of cabinets and boxes where rigid conduit is used , bond bushings where R E washers are used, 250.8 no sheet metal screws for bonding ,and grounding, 344.46 bushing for rigid nipples, 250.24 connect grd and nuetrals at p/s 250.28(A) install bond screws 8/6/2002 5:48:41 PM
|
Electrical Rough-In | 3/20/2002 | 3/21/2002 | 3/21/2002 | A | PASS |
Jack Frank
|
|
|
###-#### DAN ok 3/21/2002 10:47:01 AM
|
Electrical Rough-In | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | FAIL |
Jack Frank
|
|
|
###-#### cor. posted called left message 300.4 protection for MC cable 11/4 3/20/2002 3:01:40 PM
|
Electrical Rough-In | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | NR |
Jack Frank
|
|
|
###-#### job not ready called 3/11/2002 4:56:50 PM
|