Final | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PASS |
Pat Lass
|
|
|
|
Electrical Rough-In | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 11:43:29. Contact: ###-####.
|
Electrical Rough-In | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Marv Burrus
|
|
|
conference ###-#### ext 321 Dan 20 minutes prior to meet there. branch circuit requirements for basement remodel. 3/26/2002 1:45:20 PM
|
Electrical Rough-In | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PASS |
Jim Schmer
|
|
|
CONFERENCE ONLY ###-#### EXT. 321 DAN PLEASE CALL 1ST
|