Final | 6/3/2002 | 6/10/2002 | 6/10/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 06/03/2002 at 13:05:53. Contact: ###-####. ok 6/10/2002 10:34:34 AM
|
Final | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | CANC |
Jack Frank
|
|
|
###-#### not ready 5/6/2002 1:48:34 PM
|
Final | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | CANC |
Jack Frank
|
|
|
###-#### ALLISON see added p/s r/i no final 3/26/2002 4:25:58 PM
|
Rough-In Permanent Service | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 3/26/2002 4:26:34 PM r/i ok
p/s o/h rec. ok
|
Electrical Rough-In | 3/19/2002 | 3/19/2002 | 3/19/2002 | A | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 3/19/2002 10:59:42 AM conference only
|
Final | 3/18/2002 | 3/19/2002 | 3/19/2002 | A | CANC |
Jack Frank
|
|
|
###-#### allison see added r/i 3/19/2002 10:58:15 AM
|
Final | 3/13/2002 | 3/18/2002 | 3/18/2002 | A | FAIL |
Jack Frank
|
|
|
###-#### ALISON partial cor. posted need to meet with contractor at job site see JF for details 3/18/2002 11:49:40 AM
|