Final | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 11:13:09. Contact: ###-####.
|
Electrical Rough-In | 3/15/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 13:18:42. Contact: ###-####.
|