Final | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | DONE |
Jack Frank
|
|
|
did inspections does not show any record of it
|
Final | 3/28/2002 | 3/29/2002 | 3/29/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by Inspector: 315 On 3/28/2002 4:23:33 PM contractor never called too set up time of inspection called 3/29/2002 5:30:16 PM
|
Final | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | CANC |
Jack Frank
|
|
|
CHRIS ###-#### called contractor see added final for 03/29.02 3/28/2002 4:24:21 PM
|
Electrical Rough-In | 3/15/2002 | 3/18/2002 | 3/18/2002 | A | NH |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 12:04:45. Contact: ###-####. called left message for information no response back 3/18/2002 2:06:41 PM
|